Nuclear Power Station

  • Removed numerous electrical/mechanical components from the Feedwater     Pump Turbine.

  • Installed new electrical/mechanical components. (Pressure transmitters,     switches, LVDT's, Vibration Probes, Solenoids, etc.)

  • Wiring and calibrating pressure switches and transmitters.

  • Wiring and adjusting newly installed components. (LVDT's, Vibration     Probes, Solenoids, etc.)

  • Assisting the GE Mark VI Field and CNS System Engineers with the     checkout, testing, troubleshooting, and commissioning of the new control     system.

  • Assisting the Bentley Nevada Field and CNS System Engineers with the     checkout, testing, troubleshooting, and commissioning of the new vibration     system.

  • Support Feedwater Pump Turbine over speed testing.